{{selectedAlertBand.alertDescription}}
{{selectedAlertBand.incident.heading}}
Message last updated - Monday 25th January 2021
{{selectedAlertBand.incident.heading}}
Message last updated - Monday 25th January 2021
Message last updated - Monday 25th January 2021
{{selectedAlertBand.alertLinkText}} {{selectedAlertBand.alertLinkText}}
For further updates subscribe
If your home’s unmetered, our charge is based on its Rateable Value (RV), per pound, plus a fixed charge.
Unmetered | Fixed charge per year* | Charge per pound of RV |
---|---|---|
Water Supply | £249.71 |
£0.1424 |
Sewerage services (including surface water drainage) | £277.50** |
£0.1470 |
Sewerage services (without surface water drainage) | £242.50** |
£0.1470 |
£249.71
£0.1424
£277.50**
£0.1470
£242.50**
£0.1470
If your home’s metered, our charge is based on the volume of water used and/or a charge for sewerage, usually calculated at 90% of the water supplied, plus a fixed charge.
Metered | Fixed charge per year | Charge per cubic metre |
---|---|---|
Water supply | £29.00 | £1.5300 |
Sewerage services (including surface water drainage) | £85.00** |
£1.5541 |
Sewerage services (without surface water drainage) | £50.00** | £1.5541 |
£1.5300
£85.00**
£1.5541
£1.5541